The Links, Rest Bay

2020
Rest Bay Porthcawl
£700k
Structures
Concrete Frame under construction
Laying steel
A construction ssite overview
Anaerial view of the first floor
No items found.

About the project

An extension to an existing residential block, old and new structures were interspersed.

This was a sea front development so was completed using Peri Duo and no tower cranes due to wind.

The structure included 

  • Sympathetically designed to blend old with new.
  • 4 blocks of concrete frame.
  • 100% residential.