APB Newport Dock Expansion and Regeneration

Dec 2023 - March 2024
Newport, South Wales
£100,000
Floors
A power floated and sealed concrete floor completed by Concrete Structures and Floors Ltd at Newport Docks in South Wales.
No items found.

About the project

Concrete Structures and Floors Ltd were contracted by JG Francis Construction to complete the replacement of 10,500sqm of reinforced concrete floor slab in Shed 11 at Associated British Ports' Newport Dock in South Wales. Separated into 10 pours, we installed 600mm shutter to separate each pour and 2 layers of A393 reinforcement mesh. An anti-dusting sealant was applied after each slab had been powerfloated to create an extremely durable finish.